Tap Dawson County - Ft. Peck (Coal Hill) 230kV (GEN-2016-105)

Tap Dawson County - Ft. Peck (Coal Hill) 230kV is a 120.0 MW wind interconnection project in Dawson, Montana with a current status of withdrawn. It is proposed to connect at Tap Dawson County - Ft. Peck (Coal Hill) 230kV.

120.0 MWCapacity
WithdrawnStatus
MTMarket
WindTechnology

Project facts

Canonical nameTap Dawson County - Ft. Peck (Coal Hill) 230kV
Queue IDGEN-2016-105
Statuswithdrawn
Source statusWITHDRAWN
MarketMT
TechnologyWind
Capacity120.0 MW
StateMontana
CountyDawson
Point of interconnectionTap Dawson County - Ft. Peck (Coal Hill) 230kV
Requested (queue) date2016-11-17
Proposed in-service date
Operational date
Withdrawn date2017-07-20
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata