Tap Moore County - Hitchland 345kV (GEN-2011-012)

Tap Moore County - Hitchland 345kV is a 104.5 MW wind interconnection project in Sherman County, Texas with a current status of withdrawn. It is proposed to connect at Tap Moore County - Hitchland 345kV.

104.5 MWCapacity
WithdrawnStatus
TXMarket
WindTechnology

Project facts

Canonical nameTap Moore County - Hitchland 345kV
Queue IDGEN-2011-012
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologyWind
Capacity104.5 MW
StateTexas
CountySherman County
Point of interconnectionTap Moore County - Hitchland 345kV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2013-09-25
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata