Tap Nekoma - Bazine (Walnut Creek) 69kV (GEN-2014-025)
Tap Nekoma - Bazine (Walnut Creek) 69kV is a 2.4 MW wind interconnection project in Rush, Kansas with a current status of operational. It is proposed to connect at Tap Nekoma - Bazine (Walnut Creek) 69kV.
2.4 MWCapacity
OperationalStatus
KSMarket
WindTechnology
Project facts
| Canonical name | Tap Nekoma - Bazine (Walnut Creek) 69kV |
|---|---|
| Queue ID | GEN-2014-025 |
| Status | operational |
| Source status | IA FULLY EXECUTED/COMMERCIAL OPERATION |
| Market | KS |
| Technology | Wind |
| Capacity | 2.4 MW |
| State | Kansas |
| County | Rush |
| Point of interconnection | Tap Nekoma - Bazine (Walnut Creek) 69kV |
| Requested (queue) date | 2014-09-25 |
| Proposed in-service date | — |
| Operational date | 2015-10-15 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | MIDW |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.