Tap Nekoma - Bazine (Walnut Creek) 69kV (GEN-2014-025)

Tap Nekoma - Bazine (Walnut Creek) 69kV is a 2.4 MW wind interconnection project in Rush, Kansas with a current status of operational. It is proposed to connect at Tap Nekoma - Bazine (Walnut Creek) 69kV.

2.4 MWCapacity
OperationalStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Nekoma - Bazine (Walnut Creek) 69kV
Queue IDGEN-2014-025
Statusoperational
Source statusIA FULLY EXECUTED/COMMERCIAL OPERATION
MarketKS
TechnologyWind
Capacity2.4 MW
StateKansas
CountyRush
Point of interconnectionTap Nekoma - Bazine (Walnut Creek) 69kV
Requested (queue) date2014-09-25
Proposed in-service date
Operational date2015-10-15
Withdrawn date
Developer
Utility / transmission ownerMIDW

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata