The interXdata warehouse tracks 12 interconnection projects in Rush, Kansas, representing 820 MW of requested capacity.

12Total projects
0Active
7Operational
5Withdrawn
820 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind5452 MW
Solar2360 MW
Other58 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Spearville – Post Rock 345 kVGEN-2014-072Wind200.0 MWwithdrawnRush, Kansas
Spearville - Postrock 345kV SubstationGEN-2022-158Solar200.0 MWwithdrawnRush, Kansas
Otis 115 kV SubstationGEN-2024-085Solar160.0 MWwithdrawnRush, Kansas
Great Bend 230GEN-2013-041Wind100.0 MWwithdrawnRush, Kansas
Post Rock-Spearville 345kVGEN-2013-010Wind99.0 MWwithdrawnRush, Kansas
Alexander Wind Farm LLC58666_1Wind50.7 MWoperationalRush, Kansas
Tap Nekoma - Bazine (Walnut Creek) 69kVGEN-2014-025Wind2.4 MWoperationalRush, Kansas
La Crosse1297_7Other2.0 MWoperationalRush, Kansas
La Crosse1297_6Other1.8 MWoperationalRush, Kansas
La Crosse1297_5Other1.5 MWoperationalRush, Kansas
La Crosse1297_2Other1.1 MWoperationalRush, Kansas
La Crosse1297_1Other1.1 MWoperationalRush, Kansas

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.