Tap Nekoosa Tap-Ashdown 69 kV is a 21.6 MW solar interconnection project in Little River, Arkansas with a current status of withdrawn. It is proposed to connect at Tap Nekoosa Tap-Ashdown 69 kV.

21.6 MWCapacity
WithdrawnStatus
ARMarket
SolarTechnology

Project facts

Canonical nameTap Nekoosa Tap-Ashdown 69 kV
Queue IDGEN-2017-003
Statuswithdrawn
Source statusWITHDRAWN
MarketAR
TechnologySolar
Capacity21.6 MW
StateArkansas
CountyLittle River
Point of interconnectionTap Nekoosa Tap-Ashdown 69 kV
Requested (queue) date2017-01-31
Proposed in-service date—
Operational date—
Withdrawn date2017-11-14
Developer—
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata