Tap of LOS - Chappelle Creek 345 kV Line (GEN-2022-020)

Tap of LOS - Chappelle Creek 345 kV Line is a 355.0 MW solar interconnection project in Walworth, South Dakota with a current status of withdrawn. It is proposed to connect at Tap of LOS - Chappelle Creek 345 kV Line.

355.0 MWCapacity
WithdrawnStatus
SDMarket
SolarTechnology

Project facts

Canonical nameTap of LOS - Chappelle Creek 345 kV Line
Queue IDGEN-2022-020
Statuswithdrawn
Source statusWITHDRAWN
MarketSD
TechnologySolar
Capacity355.0 MW
StateSouth Dakota
CountyWalworth
Point of interconnectionTap of LOS - Chappelle Creek 345 kV Line
Requested (queue) date2022-06-08
Proposed in-service date2025-12-31
Operational date
Withdrawn date2023-11-06
Developer
Utility / transmission ownerBEPC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata