Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B) (J3069)

Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B) is a 70.0 MW solar interconnection project in St. Clair, Illinois with a current status of withdrawn. It is proposed to connect at Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B).

70.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B)
Queue IDJ3069
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity70.0 MW
StateIllinois
CountySt. Clair
Point of interconnectionTap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B)
Requested (queue) date2022-09-02
Proposed in-service date2027-12-27
Operational date2027-12-27
Withdrawn date2025-10-27
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata