Tap on the Spearville - Post Rock 345kV line (GEN-2022-075)

Tap on the Spearville - Post Rock 345kV line is a 175.0 MW solar interconnection project in Ellis, Kansas with a current status of active. It is proposed to connect at Tap on the Spearville - Post Rock 345kV line.

175.0 MWCapacity
ActiveStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTap on the Spearville - Post Rock 345kV line
Queue IDGEN-2022-075
Statusactive
Source statusIA PENDING
MarketKS
TechnologySolar
Capacity175.0 MW
StateKansas
CountyEllis
Point of interconnectionTap on the Spearville - Post Rock 345kV line
Requested (queue) date2022-09-02
Proposed in-service date2027-11-19
Operational date
Withdrawn date
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata