Tap onto the Cochran to Lehman line at 115kV (GEN-2018-019)

Tap onto the Cochran to Lehman line at 115kV is a 100.0 MW solar interconnection project in Yoakum, Texas with a current status of withdrawn. It is proposed to connect at Tap onto the Cochran to Lehman line at 115kV.

100.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTap onto the Cochran to Lehman line at 115kV
Queue IDGEN-2018-019
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity100.0 MW
StateTexas
CountyYoakum
Point of interconnectionTap onto the Cochran to Lehman line at 115kV
Requested (queue) date2018-05-16
Proposed in-service date
Operational date
Withdrawn date2019-06-18
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata