Tap Plainsville - Phillipsburg 115kV (GEN-2009-011)

Tap Plainsville - Phillipsburg 115kV is a 50.0 MW wind interconnection project in Rooks County, Kansas with a current status of withdrawn. It is proposed to connect at Tap Plainsville - Phillipsburg 115kV.

50.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameTap Plainsville - Phillipsburg 115kV
Queue IDGEN-2009-011
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity50.0 MW
StateKansas
CountyRooks County
Point of interconnectionTap Plainsville - Phillipsburg 115kV
Requested (queue) date2009-03-18
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerMKEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata