Tap Rock Creek-Lane 34.5kV (ASGI-2018-012)

Tap Rock Creek-Lane 34.5kV is a 35.0 MW solar interconnection project in Franklin, Kansas with a current status of withdrawn. It is proposed to connect at Tap Rock Creek-Lane 34.5kV.

35.0 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameTap Rock Creek-Lane 34.5kV
Queue IDASGI-2018-012
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity35.0 MW
StateKansas
CountyFranklin
Point of interconnectionTap Rock Creek-Lane 34.5kV
Requested (queue) date2018-07-26
Proposed in-service date
Operational date
Withdrawn date2021-05-07
Developer
Utility / transmission ownerGMO

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.