Tap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV is a 200.0 MW wind interconnection project in Grady County, Oklahoma with a current status of withdrawn. It is proposed to connect at Tap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV.

200.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameTap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV
Queue IDGEN-2011-029
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity200.0 MW
StateOklahoma
CountyGrady County
Point of interconnectionTap Rush Springs (Nat. Gas) – Rush Springs (Marlow) 138kV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2011-08-04
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata