Tap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene (GEN-2015-077)

Tap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene is a 80.0 MW solar interconnection project in Hockley County, Texas with a current status of withdrawn. It is proposed to connect at Tap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene.

80.0 MWCapacity
WithdrawnStatus
TXMarket
SolarTechnology

Project facts

Canonical nameTap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene
Queue IDGEN-2015-077
Statuswithdrawn
Source statusWITHDRAWN
MarketTX
TechnologySolar
Capacity80.0 MW
StateTexas
CountyHockley County
Point of interconnectionTap Terry – Clauene 115kV transmission line approximately 5 miles South of Clauene
Requested (queue) date2015-09-29
Proposed in-service date
Operational date
Withdrawn date2016-04-22
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.