Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line (J3118)

Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line is a 160.0 MW solar interconnection project in Morehouse, Louisiana with a current status of operational. It is proposed to connect at Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line.

160.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameTaping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line
Queue IDJ3118
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity160.0 MW
StateLouisiana
CountyMorehouse
Point of interconnectionTaping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line
Requested (queue) date2022-09-15
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date
Developer
Utility / transmission ownerMISO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata