Taping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k is a 200.0 MW solar interconnection project in Clay, Arkansas with a current status of withdrawn. It is proposed to connect at Taping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTaping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k
Queue IDJ3117
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateArkansas
CountyClay
Point of interconnectionTaping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k
Requested (queue) date2022-09-15
Proposed in-service date2026-06-30
Operational date2026-06-30
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata