Tarkington - New Long John 138kV line tap (J917)
Tarkington - New Long John 138kV line tap is a 78.0 MW solar interconnection project in Liberty County, Texas with a current status of withdrawn. It is proposed to connect at Tarkington - New Long John 138kV line tap.
78.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology
Project facts
| Canonical name | Tarkington - New Long John 138kV line tap |
|---|---|
| Queue ID | J917 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 78.0 MW |
| State | Texas |
| County | Liberty County |
| Point of interconnection | Tarkington - New Long John 138kV line tap |
| Requested (queue) date | 2017-06-16 |
| Proposed in-service date | 2019-11-01 |
| Operational date | 2019-11-01 |
| Withdrawn date | 2019-01-07 |
| Developer | — |
| Utility / transmission owner | ENTERGY ARKANSAS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata