Taygete II Energy Project (64075_TAYG2)

Taygete II Energy Project is a 203.8 MW solar interconnection project in Pecos, Texas with a current status of operational.

203.8 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameTaygete II Energy Project
Queue ID64075_TAYG2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity203.8 MW
StateTexas
CountyPecos
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-07-01
Withdrawn date
Developer
Utility / transmission ownerWest Texas Solar Project II LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata