Taylor Creek Two (202313)

Taylor Creek Two is a 60.0 MW solar interconnection project in Orange, Florida with a current status of active. It is proposed to connect at Stanton - Indian River 115 kV.

60.0 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameTaylor Creek Two
Queue ID202313
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar
Capacity60.0 MW
StateFlorida
CountyOrange
Point of interconnectionStanton - Indian River 115 kV
Requested (queue) date2024-02-14
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerOrlando Utilities Commission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata