Taylor Substation (L0407)

Taylor Substation is a 25.0 MW other interconnection project in Thurston, Washington with a current status of active. It is proposed to connect at Existing BPA tap at Kamilche/Skookum on the Olympia-Shelton #2 115kV line.

25.0 MWCapacity
ActiveStatus
WAMarket
OtherTechnology

Project facts

Canonical nameTaylor Substation
Queue IDL0407
Statusactive
Source statusCONST AGRMT EXE
MarketWA
TechnologyOther
Capacity25.0 MW
StateWashington
CountyThurston
Point of interconnectionExisting BPA tap at Kamilche/Skookum on the Olympia-Shelton #2 115kV line
Requested (queue) date2016-12-20
Proposed in-service date2020-01-01
Operational date
Withdrawn date
DeveloperPublic Utility District No. 1 of Cowlitz County
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata