Thurston County, Washington — Interconnection Projects

The interXdata warehouse tracks 12 interconnection projects in Thurston, Washington, representing 714 MW of requested capacity.

12Total projects
3Active
6Operational
3Withdrawn
714 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Wind2436 MW
Battery3240 MW
Other738 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
WA Queue Project G0921 — Wind in Thurston, WashingtonG0921Wind300.0 MWwithdrawnThurston, Washington
Centralia Battery Energy Storage System68282_CENTBattery200.0 MWactiveThurston, Washington
Skookumchuck Wind Facility63205_1Wind136.0 MWoperationalThurston, Washington
Taylor SubstationL0407Other25.0 MWactiveThurston, Washington
WA Queue Project G0830 — Battery in Thurston, WashingtonG0830Battery20.0 MWwithdrawnThurston, Washington
WA Queue Project G0942 — Battery in Thurston, WashingtonG0942Battery20.0 MWwithdrawnThurston, Washington
Yelm3878_3Other6.0 MWoperationalThurston, Washington
Yelm3878_1Other3.0 MWoperationalThurston, Washington
Yelm3878_2Other3.0 MWoperationalThurston, Washington
Skookumchuck7259_1Other1.0 MWoperationalThurston, Washington
Network Connection, 230 kV loop lineL0276Other0.0 MWoperationalThurston, Washington
Upriver McKenzie Reliability Improvement ProjectL0490Other0.0 MWactiveThurston, Washington

Top developers

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: bpa-oasis; U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.