Tazewell - AB1-122 345 kV (AH1-003)

Tazewell - AB1-122 345 kV is a 130.0 MW wind interconnection project in Lasalle, Illinois with a current status of withdrawn.

130.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameTazewell - AB1-122 345 kV
Queue IDAH1-003
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity130.0 MW
StateIllinois
CountyLasalle
Point of interconnection—
Requested (queue) date2021-04-01
Proposed in-service date2024-12-31
Operational date—
Withdrawn date2024-12-18
Developer—
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.