Tazewell-Kendall 345kV (R79)

Tazewell-Kendall 345kV is a 300.3 MW wind interconnection project in Livingston, Illinois with a current status of withdrawn.

300.3 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameTazewell-Kendall 345kV
Queue IDR79
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity300.3 MW
StateIllinois
CountyLivingston
Point of interconnection
Requested (queue) date2007-01-26
Proposed in-service date2012-12-31
Operational date
Withdrawn date2014-05-05
Developer
Utility / transmission ownerComEd

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.