TBD 23 kV (AH1-105)

TBD 23 kV is a 4.0 MW solar interconnection project in Kent, Delaware with a current status of withdrawn.

4.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTBD 23 kV
Queue IDAH1-105
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity4.0 MW
StateDelaware
CountyKent
Point of interconnection
Requested (queue) date2021-08-03
Proposed in-service date2022-04-01
Operational date
Withdrawn date2021-11-08
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata