TC Energy 230 kV Intertie at Diamond Lake Junction (L0513)
TC Energy 230 kV Intertie at Diamond Lake Junction is a 24.0 MW other interconnection project in Klamath, Oregon with a current status of active. It is proposed to connect at BPA's LaPine Substation.
24.0 MWCapacity
ActiveStatus
ORMarket
OtherTechnology
Project facts
| Canonical name | TC Energy 230 kV Intertie at Diamond Lake Junction |
|---|---|
| Queue ID | L0513 |
| Status | active |
| Source status | STUDY |
| Market | OR |
| Technology | Other |
| Capacity | 24.0 MW |
| State | Oregon |
| County | Klamath |
| Point of interconnection | BPA's LaPine Substation |
| Requested (queue) date | 2021-12-16 |
| Proposed in-service date | 2023-12-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Midstate Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata