Tehuacana Creek Solar (65855_TE1BS)
Tehuacana Creek Solar is a 418.0 MW battery interconnection project in Navarro, Texas with a current status of active.
418.0 MWCapacity
ActiveStatus
ERCOMarket
BatteryTechnology
Project facts
| Canonical name | Tehuacana Creek Solar |
|---|---|
| Queue ID | 65855_TE1BS |
| Status | active |
| Source status | (V) Under construction, more than 50 percent complete |
| Market | ERCO |
| Technology | Battery |
| Capacity | 418.0 MW |
| State | Texas |
| County | Navarro |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2026-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Parliament Energy Holdings LLC |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-02 | new_project | — | active | high |
Explore related data
Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.