Temple Power Station (58001_CTG-2)

Temple Power Station is a 232.0 MW gas interconnection project in Bell, Texas with a current status of operational.

232.0 MWCapacity
OperationalStatus
ERCOMarket
GasTechnology

Project facts

Canonical nameTemple Power Station
Queue ID58001_CTG-2
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyGas
Capacity232.0 MW
StateTexas
CountyBell
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2014-07-01
Withdrawn date
Developer
Utility / transmission ownerTemple Generation Holdings LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata