Tenn Eastman 138kV (O58)

Tenn Eastman 138kV is a 75.0 MW other interconnection project in Sullivan, Tennessee with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameTenn Eastman 138kV
Queue IDO58
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity75.0 MW
StateTennessee
CountySullivan
Point of interconnection
Requested (queue) date2005-07-28
Proposed in-service date2007-06-01
Operational date
Withdrawn date2008-08-14
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.