Tennuto BESS (26INR0598)

Tennuto BESS is a 202.0 MW battery interconnection project in Cooke, Texas with a current status of withdrawn.

202.0 MWCapacity
WithdrawnStatus
CookeMarket
BatteryTechnology

Project facts

Canonical nameTennuto BESS
Queue ID26INR0598
Statuswithdrawn
Source status—
MarketCooke
TechnologyBattery
Capacity202.0 MW
StateTexas
CountyCooke
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-07-10
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31developerTennuto BESS, LLC—low
2026-08-31poi_nameWolfridge (#730)—low
2026-08-31phaseSS Completed, FIS Started, No IA—low
2026-08-31operational_date2027-12-31—medium
2026-08-31withdrawn_date—2026-07-10high
2026-08-31statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-08-31
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata