Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) (GEN-2018-055)
Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) is a 252.0 MW solar interconnection project in Grady, Oklahoma with a current status of active. It is proposed to connect at Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie).
Project facts
| Canonical name | Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) |
|---|---|
| Queue ID | GEN-2018-055 |
| Status | active |
| Source status | IA FULLY EXECUTED/ON SCHEDULE |
| Market | OK |
| Technology | Solar |
| Capacity | 252.0 MW |
| State | Oklahoma |
| County | Grady |
| Point of interconnection | Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) |
| Requested (queue) date | 2018-05-29 |
| Proposed in-service date | 2026-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | AEP |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | active | high |
Explore related data
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata