Texas Deepwater BESS (29INR0245)
Texas Deepwater BESS is a 313.3 MW other interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at #40881 Parkes Substation 138 kV.
313.3 MWCapacity
OperationalStatus
HarrisMarket
OtherTechnology
Project facts
| Canonical name | Texas Deepwater BESS |
|---|---|
| Queue ID | 29INR0245 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Harris |
| Technology | Other |
| Capacity | 313.3 MW |
| State | Texas |
| County | Harris |
| Point of interconnection | #40881 Parkes Substation 138 kV |
| Requested (queue) date | 2026-02-13 |
| Proposed in-service date | — |
| Operational date | 2029-03-05 |
| Withdrawn date | — |
| Developer | TDWP Partners LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.