Texas Deepwater BESS is a 313.3 MW other interconnection project in Harris, Texas with a current status of operational. It is proposed to connect at #40881 Parkes Substation 138 kV.

313.3 MWCapacity
OperationalStatus
HarrisMarket
OtherTechnology

Project facts

Canonical nameTexas Deepwater BESS
Queue ID29INR0245
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHarris
TechnologyOther
Capacity313.3 MW
StateTexas
CountyHarris
Point of interconnection#40881 Parkes Substation 138 kV
Requested (queue) date2026-02-13
Proposed in-service date
Operational date2029-03-05
Withdrawn date
DeveloperTDWP Partners LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.