Texas Eastern F SS - Strong SS 115 kV Line Tap (J1484)

Texas Eastern F SS - Strong SS 115 kV Line Tap is a 25.0 MW battery interconnection project in Union County, Arkansas with a current status of withdrawn. It is proposed to connect at Texas Eastern F SS - Strong SS 115 kV Line Tap.

25.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameTexas Eastern F SS - Strong SS 115 kV Line Tap
Queue IDJ1484
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity25.0 MW
StateArkansas
CountyUnion County
Point of interconnectionTexas Eastern F SS - Strong SS 115 kV Line Tap
Requested (queue) date2019-04-29
Proposed in-service date2023-10-30
Operational date2023-10-30
Withdrawn date2020-01-14
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.