TG Windfarm LLC (56199_1)

TG Windfarm LLC is a 2.0 MW wind interconnection project in Pipestone, Minnesota with a current status of operational.

2.0 MWCapacity
OperationalStatus
MISOMarket
WindTechnology

Project facts

Canonical nameTG Windfarm LLC
Queue ID56199_1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyWind
Capacity2.0 MW
StateMinnesota
CountyPipestone
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2003-11-01
Withdrawn date—
Developer—
Utility / transmission ownerTG Windfarm LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata