TGP NNP (643AR)

TGP NNP is a 364.2 MW geothermal interconnection project in Churchill, Nevada with a current status of withdrawn. It is proposed to connect at Control Sub 115 kV Bus.

364.2 MWCapacity
WithdrawnStatus
CAISOMarket
GeothermalTechnology

Project facts

Canonical nameTGP NNP
Queue ID643AR
Statuswithdrawn
Source statuswithdrawn
MarketCAISO
TechnologyGeothermal
Capacity364.2 MW
StateNevada
CountyChurchill
Point of interconnectionControl Sub 115 kV Bus
Requested (queue) date2010-07-31
Proposed in-service date2016-06-01
Operational date
Withdrawn date2011-06-27
Developer
Utility / transmission ownerSCE

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata