TH Pfizer Jct. - Worthington (HED) (J2360)

TH Pfizer Jct. - Worthington (HED) is a 90.0 MW battery interconnection project in Vigo, Indiana with a current status of withdrawn. It is proposed to connect at TH Pfizer Jct. - Worthington (HED).

90.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameTH Pfizer Jct. - Worthington (HED)
Queue IDJ2360
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity90.0 MW
StateIndiana
CountyVigo
Point of interconnectionTH Pfizer Jct. - Worthington (HED)
Requested (queue) date2022-09-13
Proposed in-service date2027-05-07
Operational date2027-05-07
Withdrawn date2025-10-27
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata