The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p (J3770)
The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p is a 45.8 MW solar interconnection project in Randolph, Illinois with a current status of withdrawn. It is proposed to connect at The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p.
Project facts
| Canonical name | The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p |
|---|---|
| Queue ID | J3770 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Solar |
| Capacity | 45.8 MW |
| State | Illinois |
| County | Randolph |
| Point of interconnection | The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p |
| Requested (queue) date | 2024-04-01 |
| Proposed in-service date | 2027-04-30 |
| Operational date | 2027-04-30 |
| Withdrawn date | 2025-12-23 |
| Developer | — |
| Utility / transmission owner | AMEREN ILLINOIS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata