The Dalles Wind Farm (G98)

The Dalles Wind Farm is a 350.0 MW wind interconnection project in Wasco, Oregon with a current status of withdrawn. It is proposed to connect at Big Eddy-Redmond 230 kV line.

350.0 MWCapacity
WithdrawnStatus
ORMarket
WindTechnology

Project facts

Canonical nameThe Dalles Wind Farm
Queue IDG98
Statuswithdrawn
Source statusWITHDRAWN
MarketOR
TechnologyWind
Capacity350.0 MW
StateOregon
CountyWasco
Point of interconnectionBig Eddy-Redmond 230 kV line
Requested (queue) date2002-03-19
Proposed in-service date2003-09-01
Operational date
Withdrawn date
DeveloperNextera
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata