The Village at Orchard Ridge (TVOR) (67272_P5412)

The Village at Orchard Ridge (TVOR) is a 1.4 MW solar interconnection project in Frederick, Virginia with a current status of operational.

1.4 MWCapacity
OperationalStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameThe Village at Orchard Ridge (TVOR)
Queue ID67272_P5412
Statusoperational
Source status(OP) Operating
MarketPJM
TechnologySolar
Capacity1.4 MW
StateVirginia
CountyFrederick
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2023-03-01
Withdrawn date—
Developer—
Utility / transmission ownerDistributed Solar Development, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.