Themisto Solar is a 301.2 MW solar interconnection project in Nolan, Texas with a current status of operational. It is proposed to connect at Tap 345kV Champion Creek #1414 – Sweetwater East #11420.

301.2 MWCapacity
OperationalStatus
NolanMarket
SolarTechnology

Project facts

Canonical nameThemisto Solar
Queue ID27INR0218
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketNolan
TechnologySolar
Capacity301.2 MW
StateTexas
CountyNolan
Point of interconnectionTap 345kV Champion Creek #1414 – Sweetwater East #11420
Requested (queue) date2024-02-26
Proposed in-service date
Operational date2028-06-30
Withdrawn date
DeveloperThemisto Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata