Third Taxing District Units 1, 2 & 3 (121)

Third Taxing District Units 1, 2 & 3 is a 6.0 MW gas interconnection project in Fairfield, Connecticut with a current status of operational. It is proposed to connect at CL&P 27.6 kV Distribution System/Norwalk 115kV.

6.0 MWCapacity
OperationalStatus
NORMarket
GasTechnology

Project facts

Canonical nameThird Taxing District Units 1, 2 & 3
Queue ID121
Statusoperational
Source statusC
MarketNOR
TechnologyGas
Capacity6.0 MW
StateConnecticut
CountyFairfield
Point of interconnectionCL&P 27.6 kV Distribution System/Norwalk 115kV
Requested (queue) date2004-06-22
Proposed in-service date
Operational date2005-03-28
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata