Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line (GEN-2017-163)

Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line is a 25.0 MW wind interconnection project in Sedgwick, Kansas with a current status of withdrawn. It is proposed to connect at Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line.

25.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line
Queue IDGEN-2017-163
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity25.0 MW
StateKansas
CountySedgwick
Point of interconnectionThistle-Wichita Dbl Ckt (Buffalo Flats) 345kV Line
Requested (queue) date2017-11-29
Proposed in-service date
Operational date
Withdrawn date2018-12-17
Developer
Utility / transmission ownerSPP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata