THOR SOLAR (C24-186)

THOR SOLAR is a 36.6 MW solar interconnection project in Rensselaer, New York with a current status of withdrawn. It is proposed to connect at Schodack - Falls Park 115kV.

36.6 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameTHOR SOLAR
Queue IDC24-186
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity36.6 MW
StateNew York
CountyRensselaer
Point of interconnectionSchodack - Falls Park 115kV
Requested (queue) date2024-09-18
Proposed in-service date
Operational date
Withdrawn date
DeveloperBLUE STONE RENEWABLE XXI LLC
Utility / transmission ownerTransco

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata