THREE PEAKS WIND (974)

THREE PEAKS WIND is a 150.0 MW wind interconnection project in Kings, California with a current status of withdrawn. It is proposed to connect at Morrow Bay-Gates 230 kV Line.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameTHREE PEAKS WIND
Queue ID974
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyWind
Capacity150.0 MW
StateCalifornia
CountyKings
Point of interconnectionMorrow Bay-Gates 230 kV Line
Requested (queue) date2013-04-30
Proposed in-service date
Operational date
Withdrawn date2014-02-25
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.