Three W Solar (69283_TWPV1)

Three W Solar is a 110.9 MW solar interconnection project in Hill, Texas with a current status of active.

110.9 MWCapacity
ActiveStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameThree W Solar
Queue ID69283_TWPV1
Statusactive
Source status(TS) Construction complete, but not yet in commercial operation
MarketERCO
TechnologySolar
Capacity110.9 MW
StateTexas
CountyHill
Point of interconnection
Requested (queue) date
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerThree Rivers Solar Power, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata