Three Winds (29INR0246)

Three Winds is a 477.4 MW wind interconnection project in Glasscock, Texas with a current status of withdrawn.

477.4 MWCapacity
WithdrawnStatus
GlasscockMarket
WindTechnology

Project facts

Canonical nameThree Winds
Queue ID29INR0246
Statuswithdrawn
Source status—
MarketGlasscock
TechnologyWind
Capacity477.4 MW
StateTexas
CountyGlasscock
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-06-15
Developer—
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-08-01
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata