Three Winds (29INR0246)

Three Winds is a 477.4 MW wind interconnection project in Glasscock, Texas with a current status of withdrawn.

477.4 MWCapacity
WithdrawnStatus
GlasscockMarket
WindTechnology

Project facts

Canonical nameThree Winds
Queue ID29INR0246
Statuswithdrawn
Source status
MarketGlasscock
TechnologyWind
Capacity477.4 MW
StateTexas
CountyGlasscock
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2026-06-15
Developer
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.