Thunder Wolf Energy Center Hybrid (63776_TW300)

Thunder Wolf Energy Center Hybrid is a 248.0 MW solar interconnection project in Pueblo, Colorado with a current status of operational.

248.0 MWCapacity
OperationalStatus
PSCOMarket
SolarTechnology

Project facts

Canonical nameThunder Wolf Energy Center Hybrid
Queue ID63776_TW300
Statusoperational
Source status(OP) Operating
MarketPSCO
TechnologySolar
Capacity248.0 MW
StateColorado
CountyPueblo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2023-06-01
Withdrawn date
Developer
Utility / transmission ownerThunder Wolf Energy Center, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.