Tidd-Wylie Ridge 345 kV III (AF1-065)

Tidd-Wylie Ridge 345 kV III is a 100.0 MW gas interconnection project in Brooke, West Virginia with a current status of withdrawn.

100.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameTidd-Wylie Ridge 345 kV III
Queue IDAF1-065
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity100.0 MW
StateWest Virginia
CountyBrooke
Point of interconnection—
Requested (queue) date2019-07-24
Proposed in-service date2022-06-01
Operational date—
Withdrawn date2020-10-14
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.