Tierra Buena Energy Storage (64743_TB1)

Tierra Buena Energy Storage is a 2.5 MW battery interconnection project in Sutter, California with a current status of operational.

2.5 MWCapacity
OperationalStatus
CISOMarket
BatteryTechnology

Project facts

Canonical nameTierra Buena Energy Storage
Queue ID64743_TB1
Statusoperational
Source status(OP) Operating
MarketCISO
TechnologyBattery
Capacity2.5 MW
StateCalifornia
CountySutter
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2022-06-01
Withdrawn date
Developer
Utility / transmission ownerVESI 10 LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata