Timber Switch 138kV (AC1-176)

Timber Switch 138kV is a 58.7 MW wind interconnection project in Paulding, Ohio with a current status of withdrawn.

58.7 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameTimber Switch 138kV
Queue IDAC1-176
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity58.7 MW
StateOhio
CountyPaulding
Point of interconnection
Requested (queue) date2016-10-31
Proposed in-service date2019-10-31
Operational date
Withdrawn date2020-07-09
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata