Timblin 34.5 kV (AF1-240 - moved to TC1)

Timblin 34.5 kV is a 15.8 MW solar interconnection project in Armstrong, Pennsylvania with a current status of withdrawn.

15.8 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameTimblin 34.5 kV
Queue IDAF1-240 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity15.8 MW
StatePennsylvania
CountyArmstrong
Point of interconnection
Requested (queue) date2019-09-30
Proposed in-service date2022-07-01
Operational date
Withdrawn date2025-11-03
Developer
Utility / transmission ownerPENELEC

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.