Titus Low Carbon Ventures Solar 1 (26INR0211)

Titus Low Carbon Ventures Solar 1 is a 338.0 MW solar interconnection project in San Patricio, Texas with a current status of operational. It is proposed to connect at Tap 345kV 8249 Angstrom - 8624 Grissom .

338.0 MWCapacity
OperationalStatus
San PatricioMarket
SolarTechnology

Project facts

Canonical nameTitus Low Carbon Ventures Solar 1
Queue ID26INR0211
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketSan Patricio
TechnologySolar
Capacity338.0 MW
StateTexas
CountySan Patricio
Point of interconnectionTap 345kV 8249 Angstrom - 8624 Grissom
Requested (queue) date2023-10-13
Proposed in-service date
Operational date2028-10-16
Withdrawn date
DeveloperVaquero Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.